Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | KANGBO |
Model Number : | SC200(BD) KP-B02 |
Certification : | TUV |
Price : | Negotiate |
Payment Terms : | T/T, L/C |
Supply Ability : | 150 sets per month |
Delivery Time : | 30 days after receipt of down payment or L/C |
Passenger and Materal Hoist rack pinion high speed 1 ton payload KP-B02
Production and Materials
KANGBO implements the true modular design of rack and pinion
hoists, standardization and fine finishing of lifts parts and spare
parts, and assembly line production. The material elevator
components are versatile and universal.
The construction material elevator structural parts are made of
16Mn and Q345 high strength steel.
Main structure frame are made of 16Mn and Q345 high strength cold
roll steel plate, cut by laser, process by CNC machines in tool
fixtures, welded by robots.
The construction lift cage roof is made of a full steel plate, and
the edges of roof are totally welded, to ensure there is no water
leakage, and make the hoist cages with high strength.
Techincal Data
Technical Data | KP-B02 |
Payload capacity | 1,000 kg |
Lifting speed | 0–54 m/min. |
Max. lifting height | 250/400 m* |
Cage quantity | 2 cages |
Cage width (internal) | 1.5 m |
Cage length (internal) | 3.2 m |
Cage height (internal) | 2.35 m |
Motor control | FC control |
Engine power | 2x2x15 kw |
Gearbox | Helical reducer, Pieli brand |
Safety device type | centrifugal brake |
Power supply range | 380–500 V, 50 or 60 Hz, 3 phase |
Type of mast | square column 650*650 mm with bolted rack |
Length mast section | 1.508 m |
Rack module | 8 |
* Increased lifting height on request. 250 m with step-up transformer only. 400 m with step-up/step-down transformer. |
WARRANTY POLICY:
![]() |